Pre-launch · recruiting design partners for 2027

Construction digital twin

Know where every project stands, element by element

Framid turns drone flights, 360 walks and scans into a 4D twin, checks it against your BIM and schedule, and shows what is built, behind or off design.

Tower B · 4D twin · capture 6 of 8Example
Example six-storey frame of 72 elements on grid lines A to D and 1 to 3, coloured by status at the selected capture.ABCD123L1L2L3L4L5L6
Installed68%plan 70%
Behind2elements
Off design2elements
  • On plan
  • Behind
  • Off design
  • Planned

What is behind on Tower B, and why?2 elements planned by 07 Apr are not in the capture, on L4. Two level 4 bays were missed by the walk route; Roveon has them in the next mission.

ExampleA toy six-storey frame, not a real project. Drag the date through eight weekly captures.

What it measures

Four answers from every capture

One capture cycle, four questions, each answered with evidence.

Progress

Is it built?

Install status and percent complete for every element.

Deviation

Is it where the model says?

Position against the IFC model in millimetres, checked against your tolerance.

Safety · quality

Is it safe and right?

PPE, edge protection and quality issues, pinned to an element.

Forecast

Will we finish on time?

Slip forecasts from observed progress, with the cause named.

Problem

Projects find out too late

The data to catch delays early is already being captured. It just goes unread.

Today

Status lives in walkthroughs

Site walks, spreadsheets and 2D photos: slow, subjective and stale by the next pour.

Rework

Deviations surface as rework

A misplaced sleeve is found when the next trade arrives. By then it costs a tear-out and a week.

Data

Captures pile up unread

Drones, 360 cameras and phones record the site daily. Almost none of it is measured against design.

Products

Six products, one twin

Roveon captures, Splatix reconstructs, Aligna registers to your model. Sentvue inspects, Cronex forecasts, Pilora answers.

CAPRoveonRECSplatixREGAlignaVISSentvueFCSTCronexASKPiloracoverage state: where the twin is stale, fly next
Read the full sequence

Who it's for

Built for the people who answer for the schedule

For VDC teams

Set up a twin in one file

project.yaml · example
# project.yaml · how a VDC lead sets up a twin (example)
project: "tower-b"
model: "TowerB_ARCH_STR_v42.ifc"
schedule: "TowerB_baseline.xer"
capture:
  drone: "weekly, Mon 07:00"
  walk_360: "levels under fit-out, twice a week"
tolerance:
  structure_mm: 25
  embeds_mm: 10
alerts:
  off_design: "draft RFI, notify VDC"
  behind_days: 3
report: "owner summary, Mondays"

A project is a model, a schedule, a capture plan and your tolerances per element class. Your VDC lead owns the file; Framid runs it on every capture.

See integrations

FAQ

Questions project teams ask

Is this another 360 photo tool?

No. Photo tools give you pictures; Framid measures a 3D twin against your BIM, element by element. Keep your current capture tools.

Do we need a BIM model?

For element-level progress and deviation, yes: an IFC export. Without one you still get a metric twin and change between captures.

How accurate is it?

We publish no accuracy figure before field validation. Pilots measure it against survey control on your site.

Next step

See your project in the twin

We load one of your recent captures and your model, and walk you through the status and forecast.