Solutions

One twin, read four ways

Contractors recover the schedule, owners trust the report, lenders release the draw. All from the same measured evidence.

Who Framid serves
Contractors
Project controls, VDC, field
Owners
Owner's reps, development leads
Infrastructure
Civil and linear builders
Finance
Lenders, insurers, monitors

General contractors

Run the Monday meeting on measured status

Element-level progress, deviations and forecasts, ready before the meeting starts.

  • Progress by activity, read from the twin
  • Off-design elements caught before the next trade
  • Slip forecasts with the cause named
Contractor viewExample
This week
64% installed vs 69% planned
Off design
3 elements, RFIs drafted
At risk
L5 pour, about 6 days

Owners and developers

Progress you can check, not just read

See the twin the contractor sees, with evidence behind every progress claim.

  • Independent percent complete
  • Portfolio roll-up and pay-application evidence
  • As-built twin at handover (planned)
Owner viewExample
Projects
4 active
Behind plan
1 project, L5 structure
Next milestone
Topping out, forecast +6 days

Infrastructure builders

Long sites, phased work, one twin

Drone captures turn corridors that are hard to walk into progress by chainage.

  • Earthworks volumes between captures
  • Structures registered to design
  • Progress by chainage and phase
Corridor viewExample
Chainage
km 3.2 – 7.8 captured
Earthworks
Cut and fill against design
Structures
2 of 5 bridges at deck level

Lenders and insurers

Evidence behind every draw and risk review

Time-stamped status without waiting for the next site visit.

  • Independent progress for draw requests
  • Forecast risk across a loan book
  • Every figure linked to its capture
Monitor viewExample
Draw 7
Claimed 68%, twin shows 64%
Evidence
Captures 07 and 14 Apr
Open risks
2

Next step

Find your starting point

Tell us your role and projects, and we suggest where the twin helps first.