How it works
One capture in, measured status out
Every capture runs one sequence: reconstruct, register, inspect, forecast, answer. Your team captures and decides.
- 07:00
- Drone flight, 1,840 images
- 07:40
- Upload complete
- + hours
- Twin updated (design target)
- Next morning
- Status, flags and forecast ready
Illustrative timings; pilots will measure the real ones.
Sequence
The capture cycle, step by step
- CAP
Capture the site
Drone flight, 360 walk, phone scan or Roveon mission. Use what you already fly.
Whenever you capture
- REC
Reconstruct the twin
Splatix builds a georeferenced, metric twin and diffs it against the last one.
Design target: within hours
- REG
Register to the design
Aligna reads each IFC element: not started, in progress, installed or off design.
Same run
- VIS
Inspect
Sentvue pins safety and quality issues to an element and a time.
Same run
- FCST
Forecast
Cronex re-forecasts at-risk activities from observed progress.
Daily
- ASK
Answer and report
Pilora drafts the owner summary and RFIs; a person approves.
On request
Responsibilities
Who does what
| Task | Your team | Framid |
|---|---|---|
| Fly or walk the capture | Yes, or hand it to Roveon | Plans missions; flags coverage gaps |
| Provide model and schedule | IFC export, P6 or MS Project | Imports, maps activities to elements |
| Set tolerances | Per element class | Applies them to every element |
| Reconstruction and registration | — | Runs every cycle |
| Decide what an issue means | Yes | Shows the evidence and a suggested action |
| Send RFIs and reports | Approve and send | Drafts them |
Cadence
How often to capture
Capture more often for earlier warnings, and match the cadence to the work.
| Phase | Suggested capture | Why |
|---|---|---|
| Earthworks and foundations | Drone, weekly | Volumes and pours from above |
| Structure | Drone weekly + 360 walk per level | Columns, slabs and embeds |
| Envelope | Drone weekly + façade pass | Panels, brackets, glazing |
| Fit-out | 360 walk twice a week | MEP, partitions and ceilings before close-up |
FAQ
Questions about the sequence
What if a capture misses part of the site?
The twin marks it as not seen instead of guessing, and Roveon can plan a mission to fill the gap.
Can we start mid-project?
Yes. The first capture becomes the baseline; earlier progress comes from your schedule.
What about temporary works and clutter?
Scaffold, formwork and stored materials are recognised and never counted as installed.
Next step
Walk through one capture cycle
Bring a recent capture and your model, and we run each step on your data.